TESTIMONIALS

I would like to thank you for the great and professional work carried out by Rick and his team from Stone Mason. Nothing was a problem, and everything went very smooth. I can only recommend his Company for any further works. I have already contacted Rick for some works I would like to get done at Pier One. The Steps as well as our Carpark look like they had a total transformation, and this is definitely an asset for the area. Thanks as well for been so understanding with the parking issue, and helping out with the parking letters.

Regards
Ralf Bruegger
General Manager
The Sebel Pier One Sydney
Mirvac Hotels & Resorts

Stone Mason and Artist Pty Ltd was engaged by Baulderstone at our Barangaroo Headland Park project to undertake the significant task of assisting and advising on the extraction, processing, and placement, of Sydney sandstone from within the Headland Park site, they also supplied specialist stonemasons to create the 1836 wall, which divides the magnificent public access around the Headland Park project. Prior to any sandstone design being signed off by the architects (PWP), we were required to build prototypes for each component of the park, although these prototypes were pre-determined SMA made the design come to life by building them to exact detail, often improving on our expectations. SMA provided the initial supervision and advice to commence the processing of site won sandstone, this required the Sandstone to be graded to suit the extreme marine conditions of Sydney Harbour, selection of Sandstone was followed by sizing, all carried out by SMA, after sizing was finalised by design, the Sandstone blocks were passed on to the Baulderstone team for site placement. During the project SMA provided some 20 stonemasons, working over the life of the project, without doubt we could not have delivered such an outcome seen today without SMA as a delivery partner. I would like to personally take this opportunity to thank Rick and Tyron and their team for the hard work and contribution to the Headland Park project.

Matt Clothier
General Superintendent, Headland Park
Baulderstone

I have been dealing with SMA with regards to the Sandstone restoration works for Gasworks Bridge — which is a Heritage Sandstone Bridge in Parramatta.
The works involved sandstone cleaning, repointing and removal- Complete to partial- of Sandstone Blocks and replacing them with new Sandstone blocks whilst maintaining the heritage character of the Bridge.
The Sandstone blocks were also sourced from SMA owned Quarry at Appin and were found suitable for the use in this project, the scaffold and access system was complex and was designed and installed by SMA .
The works were completed on time and within budget with no reported Lost Time injury(LTI) and Medically Treated Injury(MTI) this was great as the works involved working within close proximity to Sydney Ferries, working from Barges and within tidal zone, working in Mangroves area and also within close proximity to live traffic and Pedestrians.
There were no environmental incidents even when there was flooding of the area due to unseasonal rains and also use of water to clean the stone.
I was happy with the performance of the contractor and RMS and DownerMouchel has accepted the works with minimal defects.

Regards
Murtuza A Petrolwala
Project Manager
Western Sydney Infrastructure Plan (WSIP) I Infrastructure Development